Summary
The Contractor shall remove and replace the existing Poured-in-Place (PIP) rubber surface, including the black buffing material for Marinovich Park. The Contractor shall angle-cut the buffings and surface material to create a shelf-like edge, ensuring a seamless transition between the new and existing materials. The replacement PIP material shall be FlexGround EnduraFlex (or an approved equal) and installed using Aliphatic Urethane.
The Contractor shall remove and replace all layers of the existing Poured-in-Place (PIP) rubber surfacing, including:
Base layer
Top layer
Black buffing material
The Contractor shall ensure a smooth transition between new and existing materials, as per original construction.
Approximate Area: 1,380 sq. ft.
Depth: Anticipate 3.5 inches, but match the existing depth.