Project Description [71090]

Project
PO#
BPO
PLAYGROUND POUR IN PLACE PROJECT
City of Watsonville
Watsonville Blueprint
see City of Watsonville Portal
Summary
The Contractor shall remove and replace the existing Poured-in-Place (PIP) rubber surface, including the black buffing material for Marinovich Park. The Contractor shall angle-cut the buffings and surface material to create a shelf-like edge, ensuring a seamless transition between the new and existing materials. The replacement PIP material shall be FlexGround EnduraFlex (or an approved equal) and installed using Aliphatic Urethane.

The Contractor shall remove and replace all layers of the existing Poured-in-Place (PIP) rubber surfacing, including:

Base layer

Top layer

Black buffing material

The Contractor shall ensure a smooth transition between new and existing materials, as per original construction.

Approximate Area: 1,380 sq. ft.
Depth: Anticipate 3.5 inches, but match the existing depth.
see City of Watsonville Portal